当前位置:首页 » 黄金储备 » 救灾物资储备仓库英语翻译
扩展阅读
类似于金条 2021-03-31 20:26:33
何兰黄金市厂 2021-03-31 20:26:32
蒲币对人民币汇率 2021-03-31 20:26:27

救灾物资储备仓库英语翻译

发布时间: 2021-03-17 05:18:18

Ⅰ 广东储备物资管理局八三0处英文翻译名称

广东储来备物资管理源局八三0处
Guangdong Reserve Materials Administration Bureau, Department 830

如果答案对亲有所帮助请采纳予以鼓励!
如果有疑问欢迎追问...

Ⅱ 英文翻译(海地地震后,中国政府16日晚用飞机运送价值1300万元的救灾物资,包括帐篷、担架、食品、药品...

Haiti after the earthquake, the Chinese government 16, with a plane with late 13 million yuan worth of disaster relief materials, including tents, stretcher, food, medicine, clothing, etc. The Red Cross society of China also donated 1 million dollars

Ⅲ “国家物资储备管理局”英文该怎么翻译啊

Country material reserves administrative bureau 吧

Ⅳ 英语翻译

First, the materials amount control: first,persist in ascertaining materials wastages according to the quota, put quota into materials drawing system; second,we should improve the construction technology, and extend the use of new technology, new craft,and new materials to rece the consumption of materials. Again,a functional analysis of the project and analysis of the material properties are necessary to use low-cost materials to replace expensive materials,and strengthen materials turnover management, increase turnover number of times.
首先,器材金额的控制:第一,坚持根据配额确定器材的浪费量,把配额放进器材图纸(或绘图)体系中;其次,我们应改进施工技术,推广使用新技术、新工艺和新材料,以降低器材的消耗量。而且,为了用低价的器材取代昂贵的器材,必须进行项目的功能分析和材料性质的分析,还要加强器材周转的管理,增加周转的次数。
Second,the materials price control: the price of materials is controlled场the purchasing department in purchasing process. First,make an investigation to the market quotations,in the premise of guaranteeing the quality and quantity, shop around to choose and purchase materials; Second,organize transportation rationally, purchase materials nearby,choose the most economical mode of transportation in order to rece the cost; Another thing is that people should consider the time value of the money,rece capital occupied,ascertain purchase of merchandise batches and the batch rationally,rece material reserves as far as possible.
其次,器材价格控制:器材的价格在采购过程中由采购部门控制。第一,对市场的报价进行调查,在保证质量和数量的前提下,货比三家地挑选和购买器材;第二,为了降低成本,要合理组织运输,就近购买器材,选择最经济的运输方式。另一件事就是,人们应该考虑金钱的时间价值,减少资金的占用,合理确定商品批和批次的购买,尽量减少器材(物资)的储备
3.1 .2 Labor cost control
Labor cost accounts for a larger proportion of total project costs,generally at about 10%,so people should control the labor cost strictly. Controlling the labor quantity is essential to minimize or rece the everyday consumption of labor of certain working procere,in order to the achieve the objective of recing the everyday consumption of labor and controlling the project cost.
3.1.2 劳动力成本的控制
劳动力成本占到项目总成本的较大比例,一般在10%左右,因此,人们应严格控制劳动力成本。尽量减小或降低一定工作程序每天的劳动力消耗是必不可少的,这样才能实现降低每日劳动力消耗和控制项目成本的目的。
3.1 .3 Machinery cost control
To achieve controlling the machinery cost,these are necessary to make full use of existing machinery equipment,manage interior rationally,strive to enhance the utilization ratio of the main machinery,and when selecting equipment,pay attention to multi-purpose of the equipment to rece the amount of the personnel who maintain the equipment and the cost for the small amount accessories of equipment.
3.1.3 机械成本的控制
为了实现对机械成本的控制,必须充分利用现有的机械设备,合理管理内政,努力提高主要机械的利用率,而在选择设备时,注意多用途的设备,从而减少设备维护人员,以及降低小量设备附件的成本。

Ⅳ 中央防汛抗旱物资山东储备库管理处公用笺 请问翻译成英语应该怎么样的

The Central Supply Office of Flood Control and Drought Management,Shandong Branch Public Writing Paper

Ⅵ 应急物资储备管理的研究 翻译成英文是什么。

Emergency supplies reserves management research